质量控制vs Verify Scope

July 26, 2020
Fahad Usmani
质量控制vs Verify Scope

在第五版的PMbob手机客户端BOK指南中,验证范围过程取代了验证范围过程。因此,这篇文章已过时。请参阅我的新博客文章质量控制和验证范围

The quality control and verify scope processes are important for a project as they ensure that the deliverable is defect free and meets the user’s requirements.

Since both processes involve inspection and testing many professionals get confused and think that they are the same. They have different objectives and are carried out with a different goal in mind.

质量控制

在质量控制过程中,您可以检查可交付的正确性,并查看其是否符合规格。

Quality control activities are performed throughout the monitoring and controlling phase by the team members. This ensures that the product is defect free and all parameters are within acceptable limits.

There are many tools and techniques to use during this process, including: inspection,因果图,,,,control chart, run chart,,,,scatter diagram,,,,etc.

Example

现在,让我们看看控制质量过程的真实示例。

You were appointed as a project manager for a government contract for the building of a 1,000 km road. In your team, you have a quality control engineer to monitor the quality activities.

This quality control engineer will be on site to inspect and recommend changes to the deliverable if required so that it conforms to the stated requirements. He will check if all the materials supplied are of the required quality, e.g., coal tar, the stones are crushed properly, the ground level is correct, or if the sidewalk is properly aligned, etc.

Verify Scope

In this process, you will inspect the deliverable with the client to see if it meets all requirements and is acceptable.

验证范围过程是在项目的监视和控制阶段进行的。

Both processes have only one similarity: they are performed during the monitoring and controlling phase of the project. However, the objective of the verify scope process is to get formal acceptance from the client on the deliverable.

Example

Now we will look at the verify scope activities using the same example discussed above.

You have built 100 km of the required 1,000 km of road and it is ready for delivery. You invite the authorities to come and inspect and formally accept it.

政府代表到并验证whether or not you meet all the requirements. They check some criteria, e.g., if the road width is correct, the road leveling is okay, and the length of the completed part of the road.

Once they are satisfied, they will formally accept the completed part of the road and you get paid.

Please note that it is not always necessary to perform the verify scope process at the end of every project. It can happen far before the project ends. You can also perform the verify scope activities with the quality control process, as is seen in the example above.

In the given example, both processes are being performed in parallel. The government’s representatives are verifying the scope for the completed part of the road with you, and at the same time, your team is building and testing the rest of the road.

Differences Between Quality Control and Verify Scope

质量控制和验证范围过程之间的差异如下:

  • 质量控制涉及产品的质量,而验证范围过程涉及产品范围。
  • Quality control activities are performed internally, while the verify scope process is performed with the client.
  • 质量控制活动是在项目执行过程中执行的,而验证范围过程通常是在项目或阶段结束时执行的。
  • The objective of the quality control process is to produce a defect-free product, while the purpose of the verify scope process is to get the deliverable accepted by the client.

Conclusion

Both the control quality and verify scope processes are important for a project. The quality control process helps to create a defect-free and high-quality product. The verify scope process helps to get the product accepted by the client. Quality control activities are performed throughout the monitoring and controlling phase and verify scope activities are needed when the deliverable is ready to be delivered.

There is another process called quality assurance which is often mistaken for quality control. Please visit:质量保证和质量控制to learn more about it.

How are quality control and verify scope activities performed in your project? Please share your thoughts in the comment section.

PMP问题库

This is the most popular Question Bank for the PMP Exam. To date, this PMP Question Bank has helped over 10,000 PMP aspirants pass the PMP exam.

PMP Formula Guide

This is the most popular Formula Guide for the PMP Exam. If you face difficulty with attempting mathematical questions for the PMP exam.



Recommended Reading


Speak Your Mind

  • Quality control activities are performed throughout the monitoring and controlling phase and verify scope activities are needed when the deliverable is ready to be delivered

  • 嗨,法哈德,

    Thank you for your useful post and simple explanations. I’ve noticed a contradiction on your post.

    Under the “Verify Scope” headline of your post, you stated that “The verify scope process is also performed during the monitoring and controlling phase of the project.

    这两个过程均在项目的监视和控制阶段进行,但是,这是唯一的相似性。”

    Under the “Conclusion” headline, on the other hand, you stated that “Quality control activities are performed throughout the execution phase”

    附注:根据RITA的过程图表质量控制,在监视和控制阶段进行。

    • Executing and Monitoring phases occur simultaneously. You are working on a deliverable and at the same time you are monitoring it as well so as to make it defect free.

      • 嗨,法哈德,

        How do you answer the following questions? (I’m just trying to fill my knowledge gap. I only study from Rita’s book, and maybe this is a wrong strategy for me.)

        Q1: In which process group you perform quality control?

        a)计划
        b) Executing
        c) Monitoring&Controlling
        d) Closing

        Q2: In which process group you perform quality assurance?

        a)计划
        b) Executing
        c) Monitoring&Controlling
        d) Closing

  • hi Fahad, I like the analogy with respect to a road construction, very good.

    I wonder if by including in your example QA aspects of the project, will aid explanation of the 3 very closely related aspects of QA/QC? Of course this have been mentioned already; i did not read all the messages! regards Gordon

  • 嗨,法哈德。
    I am quite confuse of the Verified deliverable as output of Control Quality and input of Verify scope. Some of the trial exams and even PMBOK 5th edition, it is Validated deliverable in Control Quality output. Hope you can help me with this confusion.

  • 我认为此博客文章有一个错误。当您尝试解释质量控制与验证范围之间的区别时,我认为您是要说“质量控制与验证范围”。验证来自拉丁语“ veritus”的意思。当您验证某些内容时,您会评估产品,服务或系统是否符合法规,需求,规范或强加条件。这是一个内部过程。结果,您说要在帖子上进行验证和质量控制是同一件事。
    您所说的以验证您的帖子验证是为了“验证”而不是验证。
    To validate something means the assurance that a product, service or system meets the needs of a customer or identified Stakeholder. It often involves acceptance or compliteness. It’s external, It’s being performed between the PM and the Stakeholder.

  • Hi – I’m studying for the pump exam. Can you please confirm if the correct name is verify scope. Pmbok 5 references this process as validate scope.

    Thanks!! I just want to make sure I get the terminology correct. ????

  • Hi
    我发现了这个论坛,发现它很有趣。有没有皇家印的国王和iTil的很好的解释,这使得事情现在很清楚
    为我

    • 感谢卡尔文的访问。

      I did not see any blog particularly on the RMP but you can find many RMP related discussions and notes on many PMP forums and blogs.

      对Itil不知道。

  • 嗨,法哈德 -

    当我准备六月中旬的考试时,您能尽快解释一下,需要理解。另外,您是否有关于diff的任何博客文章。优质的扭动(Juran,Deming等)?我也对差异感到困惑。项目选择方法。

    太感谢了

    Sangeeta

  • 嗨,法哈德,

    Really appreciate your blogs and your explanations, can you please help me understand how to calculate Standard Deviation? I just don’t seem to get it.

    Thanks

    • 你好桑格塔,

      要计算标准偏差,您必须计算平均值和方差。然后,只有您才能计算标准偏差。

      无论如何,现在我要写一篇博客文章,涵盖了这些观点。一旦我发布了这篇文章,希望您在计算标准偏差时永远不会有任何问题。

  • I also like Andy Crowe’s explanation of the two processes

    Verify scope refers to the completeness and Quality control refers to the correctness

  • 法哈德,
    I am preparing for PMP exam.
    I just now happened to see your blogs.
    The subtle difference between various quality terms are nicely explained.
    多谢。
    Mani Naga

  • Thanks. From the explanation, can one therefore conclude that Quality control and Verify scope are practically the same only that the performing agent are different? That is,what the customer calls Quality Control is Verify Scope in the eyes/lips of the performing organization

  • {“电子邮件”:“电子邮件地址无效”,“ url”:“网站地址无效”,“必需”:“必需字段丢失”}

    推荐资源b0b体育app

    Use these resources for your PMP certification exam preparation and pass the exam with minimal effort.

    PMP培训计划


    PMI批准35小时培训项目联系bob体育网页登录that is 100% online, affordable, and help you prepare the PMP exam.

    The PMP Exam Preparation Tool


    A PMP exam preparation course, that is 100% online and provide you everything you need to pass the PMP exam.

    >