更改PMP认证考试 - 2016年1月

June 9, 2021
Fahad Usmani,PMP
更改PMP考试2016年1月

Update: The PMP exam update has moved to January 11th, 2016 to allow all stakeholders adequate time to prepare for this change (Source:PMI).

2015年6月,PMI发布了新的PMP认证考试内容大纲,2016年1月11日之后,PMP考试将基于新的考试内容大纲。(以前,更改的预定日期是2015年11月1日)。

This has caused panic among PMP aspirants.

我收到了许多有关这些更改的电子邮件。许多人认为,如果他们在2016年1月11日之前不通过考试,他们的努力将徒劳无功,他们必须根据新的教学大纲开始学习。

Many PMP aspirants’ eligibility will expire soon after the change and they are worried that they don’t have enough time to prepare with the new format if they fail.

Likewise, many aspirants have issues.

Therefore, I am writing this blog post to answer their queries. I believe I can clear up your doubts.

首先,放松。这不是考试的重大变化,PMBOK指南第五版仍然是考试参考。bob手机客户端没有从教学大纲中删除任何任务。因此,您所研究的任何内容都是有效的。

Now we come to the new content.

The current PMP Exam Content Outline has 34 tasks, and after January 11th, 2016 it will have 42 tasks; PMI has added eight new tasks.

These eight tasks are:

Domain–I (Initiating): Three new tasks were added to this process group (task 2, task 7, and task 8).

Domain–II (Planning): One new task was added to the executing process group (task 13).

域– III(执行):在此过程组中添加了两个新任务(任务6,任务7)。

Domain–IV (Monitoring and Controlling): Two new tasks were added here (task 6, task 7).

Domain–V (Closing): No new tasks were added to this process group.

You might think that this is a lot; however, that is not the case. You have already studied most of the tasks during your preparation.

For example, let’s look at one new task added to the monitoring and controlling process group:

“使用经验教训的管理技术来捕获,分析和管理经验教训,以持续改进。”

读一遍,问问你自己,你看到的this for the first time?

尽管这是考试内容大纲中添加的新任务,但您已经知道这些任务。

Likewise, most of the other new tasks are not entirely new, and you have read them in your reference books and in training sessions: for example, lean management, Kanban,Six Sigma,和ISO,等等

So, you should not worry about the exam content and focus on exam preparation. If you pass the exam before November 1st, good for you! However, if you cannot pass the exam before January 11th, 2016, don’t worry, your preparation will be valid and you can retake the exam comfortably.

已经添加了一些新任务,但是您可以使用当前的研究材料研究大多数内容,其余的可以在互联网上进行研究。我不建议您购买任何新书或再次参加培训。

If you have attended training andearned 35 contact hours, they are valid for life.

Why Was This Change Required?

与利益相关者咨询后每三到五年,PMI根据角色描述研究(RDS)更新其考试内容。RDS流程可确保课程内容保持更新。此程序确保了PMP认证的相关性,并确保对您和行业有益;因此,与其对其学习并通过PMP考试,不要过度思考它。

Summary

我并不意味着您应该忽略添加的内容。我只是说这不是一个巨大的变化。没有什么都没有带出蓝色并添加到考试内容中,您不应该过度思考。我建议您注意添加的任务,然后通过它们通过PMP考试。

What do you think about the current change in the PMP exam? Please share your thoughts in the comments section.

PMP Question Bank

This is the most popular Question Bank for the PMP Exam. To date, this PMP Question Bank has helped over 10,000 PMP aspirants pass the PMP exam.

PMP Formula Guide

This is the most popular Formula Guide for the PMP Exam. If you face difficulty with attempting mathematical questions for the PMP exam.



Recommended Reading


Speak Your Mind

  • HI Fahad,

    许多读者对RD和PMBOK指南感到困惑。bob手机客户端上面的评论之一提出了同样的事情。bob手机客户端PMBOK指南是PMP考试的主要参考书,但考试基于RDS。因此,学生也应该研究其他参考材料。
    BR
    Praveen.

    • As per the PMI:

      PMI每五到七年为PMP证书进行角色划定研究,以确保证书反映当代实践并不断发展以满足该行业的当前需求,并遵守PMP凭证对ISO 17024标准的认证。

  • Hello Fahed,

    I have completed my studies for the PMP exam, I was thinking of doing the exam in the next couple of days but after going through the changes I am reluctant to do so. Do you think that studying the fifth edition will be enough now to pass or should I wait to study the new changes?

    And if you suggest to wait, everyone is talking about the changes but there are no notes or any information available on the changes to study from, do you have any documents that I can use to study these new changes?

    Thnx

  • 法哈德,
    感谢您在博客中所做的所有努力,绝对是宝贵而富有成果的。
    I am preparing for PMP exam and I am planning to take the exam on Feb, 2016.
    除了您的博客,400个考试问题和PMBOK外,您还会推荐其他学习来源吗?
    您建议新的8个任务能够在新考试版本中达到高分的建议?

    谢谢

  • Thank you for the information. I am certain I will pass the exam before the original (Nov) cut-off, I always like to know my options. I spent more time wondering if my cert. would be discounted by prospects “at Large”. the day I receive it.

    我想你放心了。

  • PMI, PMBOK, PMP, CAPM, PMI-ACP and the PMI Registered Education Provider logo are all registered marks of the Project Management Institute, Inc. November 1, 2015 will be the last day that you will be able to write the PMP exam before PMI makes some significant changes.

  • Hi Fahad,
    I have attended PMP test on 8/17/2015 but it was not through.
    The results were:
    启动,计划和M&C(中等熟练)
    执行和闭幕式(以下中等熟练)

    I felt the exam was so tough as i got more questions on Procurement decisions.
    我打算再次参加测试,请您帮助我改善执行和关闭区域。

    提前致谢。

    Regards
    Prathapa

  • 我是PMP认证,但我不明白新任务是什么意思?我知道47过程,所以您的意思是他们是新过程吗?

    Regards,

  • {“电子邮件”:“邮件地址无效”,“url”:”网站的广告dress invalid","required":"Required field missing"}

    Recommended Resources

    将这些资源用于您的Pb0b体育appMP认证考试准备,并以最少的精力通过考试。

    PMP培训计划


    PMI批准了35个接触时间培训计划,该计bob体育网页登录划在线100%,负担得起,并帮助您准备PMP考试。

    The PMP Exam Preparation Tool


    PMP考试准备课程,即100%在线,并为您提供通过PMP考试所需的一切。

    >