changes pmp exam january 2016

Update: The PMP exam update has moved to January 11th, 2016 to allow all stakeholders adequate time to prepare for this change (Source:PMI).

2015年6月,PMI发布了新的PMP认证考试内容大纲,2016年1月11日之后,PMP考试将基于新的考试内容大纲。(以前,更改的预定日期是2015年11月1日)。

This has caused panic among PMP aspirants.

我收到了许多有关这些更改的电子邮件。许多人认为,如果他们不在2016年1月11日之前通过考试,他们的努力将是徒劳的,他们必须根据新的教学大纲开始学习。

Many PMP aspirants’ eligibility will expire soon after the change and they are worried that they don’t have enough time to prepare with the new format if they fail.

Likewise, many aspirants have issues.

因此,我正在写这篇博客文章来回答他们的查询。我相信我可以清除您的疑问。

First, relax. It is not a major change in the exam, and the PMBOK Guide 5th Edition is still the exam reference. No tasks have been removed from the syllabus. So, whatever you have studied will be valid.

现在我们来到新内容。

The current PMP Exam Content Outline has 34 tasks, and after January 11th, 2016 it will have 42 tasks; PMI has added eight new tasks.

These eight tasks are:

域– I(启动):将三个新任务添加到此过程组(任务2,任务7和任务8)。

Domain–II (Planning): One new task was added to the executing process group (task 13).

域– III(执行):在此过程组中添加了两个新任务(任务6,任务7)。

Domain–IV (Monitoring and Controlling): Two new tasks were added here (task 6, task 7).

Domain–V (Closing): No new tasks were added to this process group.

You might think that this is a lot; however, that is not the case. You have already studied most of the tasks during your preparation.

例如,让我们看一下添加到监视和控制过程组中的一项新任务:

“使用经验教训的管理技术来捕获,分析和管理经验教训,以持续改进。”

再次阅读并问自己,您是第一次看到这个吗?

尽管这是考试内容大纲中添加的新任务,但您已经知道这些任务。

Likewise, most of the other new tasks are not entirely new, and you have read them in your reference books and in training sessions: for example, lean management, Kanban,六个西格玛, and ISO, etc.

So, you should not worry about the exam content and focus on exam preparation. If you pass the exam before November 1st, good for you! However, if you cannot pass the exam before January 11th, 2016, don’t worry, your preparation will be valid and you can retake the exam comfortably.

已经添加了一些新任务,但是您可以使用当前的研究材料研究大多数内容,其余的可以在互联网上进行研究。我不建议您购买任何新书或再次参加培训。

If you have attended training and赚了35个接触时间bob体育网页登录,它们对生活有效。

Why Was This Change Required?

The PMI updates its exam content based on the Role Delineation Study (RDS) every three or five years after consulting with stakeholders. The RDS process ensures that the course content remains updated. This procedure ensures the relevancy of the PMP certification and guarantees that it is good for you and the industry; therefore, instead of overthinking it, focus on your studies and pass the PMP exam.

概括

我并不意味着您应该忽略添加的内容。我只是说这不是一个巨大的变化。没有什么都没有带出蓝色并将其添加到考试内容中,您不应该过度思考。我建议您注意附加的任务,然后通过它们通过PMP考试。

What do you think about the current change in the PMP exam? Please share your thoughts in the comments section.